NETWORK DESIGN MASTERY — the complete 7-module corporate training program by Zohaib Butt • Launch offer: $87 + $100 Free Procurement Integrity Strategy Session (regular $187)
7 modules • 266 slides in 5 colors • 7 scripts & workbooks • 350 assessment statements

Install the Procurement Integrity Operating System Your Team Keeps Pretending to Have

Procurement Integrity Mastery ships the complete stack: 266 slides in five corporate color editions, seven word-for-word scripts, seven participant workbooks, 350 assessment statements and six documented case studies — Ukraine's ProZorro, The Open Contracting Partnership, ChileCompra, Moldova's MTender, The Global Public Procurement Network and The Infrastructure Transparency Initiative.

$187$87regular price $187 — launch price + $100 free bonus
Launch price ends in 23hrs: 59min: 59sec
Instant download PPTX + Word + Print PDF 5 corporate color editions Free $100 1-on-1 Procurement Integrity Strategy Session Session
266Slides — 5 color editions
7Modules & signature frameworks
16Asset sets per program
350Assessment statements
The seven modules

Hover a Module.
Watch Its Delivery Stack Come Alive.

Every module in Procurement Integrity runs on the same executive engine — six 60-minute modules plus a 30-minute capstone — installing one signature mnemonic framework (T.I.E Model, S.P.E.C Model, B.I.D Model, E.V.A.L Model, A.W.A.R.D Model, W.A.T.C.H Model, The Mastery Stack), drilling one documented case study (Ukraine's ProZorro, The Open Contracting Partnership, ChileCompra, Moldova's MTender, The Global Public Procurement Network, The Infrastructure Transparency Initiative), and producing one signed operating commitment.

1

Spend in Daylight

T.I.E Model · Ukraine's ProZorro

Hover to explore module ↗
2

Specifications That Invite Markets

S.P.E.C Model · The Open Contracting Partnership

Hover to explore module ↗
3

Fair and Full Tendering

B.I.D Model · ChileCompra

Hover to explore module ↗
4

Evaluating Bids on Evidence

E.V.A.L Model · Moldova's MTender

Hover to explore module ↗
5

Awards That Defend Themselves

A.W.A.R.D Model · The Global Public Procurement Network

Hover to explore module ↗
6

The Integrity Watch

W.A.T.C.H Model · The Infrastructure Transparency Initiative

Hover to explore module ↗
7

Integration, Action Planning and Procurement Mastery

The Mastery Stack · 30-60-90 Plan

Hover to explore module ↗
Module 01: Spend in Daylight (T.I.E Model)60 min • Case: Ukraine's ProZorro
M1-01
Spend in Daylight

What It Installs — From Quiet Deals to Open Competition. The T.I.E loop runs on the Ukraine's ProZorro case: T Track Every Award -> I Inspect the Patterns -> E Enforce the Disclosure - one visible artifact per session, written commitments at the close.

M1-02
T.I.E Model

Signature Mnemonic Framework — Installs the T.I.E Model (T Track Every Award – I Inspect the Patterns – E Enforce the Disclosure) — run it every week, not just when the review lands.

M1-03
Case: Ukraine's ProZorro

— The documented case this module drills: read with the room, debated against the T.I.E framework, and closed with written commitments your team can be held to.

M1-04
Deck, Script & Workbook

Complete Module Delivery Pack — Complete Module 01 delivery pack — slide deck in 5 corporate color editions (PPTX + PDF), word-for-word facilitator script, and slide-anchored participant workbook for Spend in Daylight.

M1-05
50-Statement Assessment, Activity & Game

Practice-First, Every Module — Five competencies scored statement by statement — 350 statements across the full program — plus a live-work lab, The Spend Map Workshop, and a framework recall game in every module.

Module 02: Specifications That Invite Markets (S.P.E.C Model)60 min • Case: The Open Contracting Partnership
M2-01
Specifications That Invite Markets

What It Installs — From Quiet Deals to Open Competition. The S.P.E.C loop runs on the The Open Contracting Partnership case: S State the Need -> P Pin the Essentials -> E Exclude the Slanted -> C Confirm the Market - one visible artifact per session, written commitments at the close.

M2-02
S.P.E.C Model

Signature Mnemonic Framework — Installs the S.P.E.C Model (S State the Need – P Pin the Essentials – E Exclude the Slanted – C Confirm the Market) — run it every week, not just when the review lands.

M2-03
Case: The Open Contracting Partnership

— The documented case this module drills: read with the room, debated against the S.P.E.C framework, and closed with written commitments your team can be held to.

M2-04
Deck, Script & Workbook

Complete Module Delivery Pack — Complete Module 02 delivery pack — slide deck in 5 corporate color editions (PPTX + PDF), word-for-word facilitator script, and slide-anchored participant workbook for Specifications That Invite Markets.

M2-05
50-Statement Assessment, Activity & Game

Practice-First, Every Module — Five competencies scored statement by statement — 350 statements across the full program — plus a live-work lab, The Spec Sheet Workshop, and a framework recall game in every module.

Module 03: Fair and Full Tendering (B.I.D Model)60 min • Case: ChileCompra
M3-01
Fair and Full Tendering

What It Installs — From Quiet Deals to Open Competition. The B.I.D loop runs on the ChileCompra case: B Broadcast the Opportunity -> I Invite on Equal Terms -> D Decide on Published Rules - one visible artifact per session, written commitments at the close.

M3-02
B.I.D Model

Signature Mnemonic Framework — Installs the B.I.D Model (B Broadcast the Opportunity – I Invite on Equal Terms – D Decide on Published Rules) — run it every week, not just when the review lands.

M3-03
Case: ChileCompra

— The documented case this module drills: read with the room, debated against the B.I.D framework, and closed with written commitments your team can be held to.

M3-04
Deck, Script & Workbook

Complete Module Delivery Pack — Complete Module 03 delivery pack — slide deck in 5 corporate color editions (PPTX + PDF), word-for-word facilitator script, and slide-anchored participant workbook for Fair and Full Tendering.

M3-05
50-Statement Assessment, Activity & Game

Practice-First, Every Module — Five competencies scored statement by statement — 350 statements across the full program — plus a live-work lab, The Tender Calendar Workshop, and a framework recall game in every module.

Module 04: Evaluating Bids on Evidence (E.V.A.L Model)60 min • Case: Moldova's MTender
M4-01
Evaluating Bids on Evidence

What It Installs — From Quiet Deals to Open Competition. The E.V.A.L loop runs on the Moldova's MTender case: E Establish the Panel -> V Vet the Conflicts -> A Adjudicate on Criteria -> L Log Every Judgment - one visible artifact per session, written commitments at the close.

M4-02
E.V.A.L Model

Signature Mnemonic Framework — Installs the E.V.A.L Model (E Establish the Panel – V Vet the Conflicts – A Adjudicate on Criteria – L Log Every Judgment) — run it every week, not just when the review lands.

M4-03
Case: Moldova's MTender

— The documented case this module drills: read with the room, debated against the E.V.A.L framework, and closed with written commitments your team can be held to.

M4-04
Deck, Script & Workbook

Complete Module Delivery Pack — Complete Module 04 delivery pack — slide deck in 5 corporate color editions (PPTX + PDF), word-for-word facilitator script, and slide-anchored participant workbook for Evaluating Bids on Evidence.

M4-05
50-Statement Assessment, Activity & Game

Practice-First, Every Module — Five competencies scored statement by statement — 350 statements across the full program — plus a live-work lab, The Evaluation File Workshop, and a framework recall game in every module.

Module 05: Awards That Defend Themselves (A.W.A.R.D Model)60 min • Case: The Global Public Procurement Network
M5-01
Awards That Defend Themselves

What It Installs — From Quiet Deals to Open Competition. The A.W.A.R.D loop runs on the The Global Public Procurement Network case: A Announce With Reasons -> W Weigh the Objections -> A Affirm or Correct -> R Record the Outcome -> D Defend in Public - one visible artifact per session, written commitments at the close.

M5-02
A.W.A.R.D Model

Signature Mnemonic Framework — Installs the A.W.A.R.D Model (A Announce With Reasons – W Weigh the Objections – A Affirm or Correct – R Record the Outcome – D Defend in Public) — run it every week, not just when the review lands.

M5-03
Case: The Global Public Procurement Network

— The documented case this module drills: read with the room, debated against the A.W.A.R.D framework, and closed with written commitments your team can be held to.

M5-04
Deck, Script & Workbook

Complete Module Delivery Pack — Complete Module 05 delivery pack — slide deck in 5 corporate color editions (PPTX + PDF), word-for-word facilitator script, and slide-anchored participant workbook for Awards That Defend Themselves.

M5-05
50-Statement Assessment, Activity & Game

Practice-First, Every Module — Five competencies scored statement by statement — 350 statements across the full program — plus a live-work lab, The Award File Workshop, and a framework recall game in every module.

Module 06: The Integrity Watch (W.A.T.C.H Model)60 min • Case: The Infrastructure Transparency Initiative
M6-01
The Integrity Watch

What It Installs — From Quiet Deals to Open Competition. The W.A.T.C.H loop runs on the The Infrastructure Transparency Initiative case: W Weigh the Red Flags -> A Audit on Schedule -> T Treat Findings Fast -> C Correct the Register -> H Heed the Overseers - one visible artifact per session, written commitments at the close.

M6-02
W.A.T.C.H Model

Signature Mnemonic Framework — Installs the W.A.T.C.H Model (W Weigh the Red Flags – A Audit on Schedule – T Treat Findings Fast – C Correct the Register – H Heed the Overseers) — run it every week, not just when the review lands.

M6-03
Case: The Infrastructure Transparency Initiative

— The documented case this module drills: read with the room, debated against the W.A.T.C.H framework, and closed with written commitments your team can be held to.

M6-04
Deck, Script & Workbook

Complete Module Delivery Pack — Complete Module 06 delivery pack — slide deck in 5 corporate color editions (PPTX + PDF), word-for-word facilitator script, and slide-anchored participant workbook for The Integrity Watch.

M6-05
50-Statement Assessment, Activity & Game

Practice-First, Every Module — Five competencies scored statement by statement — 350 statements across the full program — plus a live-work lab, The Red-Flag Register Workshop, and a framework recall game in every module.

Module 07: Integration, Action Planning and Procurement Mastery (The Mastery Stack)30 min • Capstone: 30-60-90 Plan
M7-01
Integration, Action Planning and Procurement Mastery

What It Installs — From Quiet Deals to Open Competition. The Mastery Stack pulls all six frameworks into one operating system and one signed 30-60-90 Procurement Integrity plan — the program's capstone deliverable.

M7-02
The Mastery Stack

Signature Capstone — Stacks the six frameworks (T.I.E – S.P.E.C – B.I.D – E.V.A.L – A.W.A.R.D – W.A.T.C.H) into a single operating system, rehearsed end-to-end and signed in the room.

M7-03
Case: The Global Public Procurement Network

— The capstone case is read with the room and folded into the plan: where the work starts, who owns it, and how the first ninety days are measured.

M7-04
Deck, Script & Workbook

Complete Module Delivery Pack — Complete Module 07 delivery pack — slide deck in 5 corporate color editions (PPTX + PDF), word-for-word facilitator script, and slide-anchored participant workbook for Integration, Action Planning and Procurement Mastery.

M7-05
50-Statement Assessment, Activity & Game

Practice-First, Every Module — Five competencies scored statement by statement — 350 statements across the full program — plus a live-work lab, The Mastery Stack Signing, and a framework recall game in every module.

Module 01 of 07 • T.I.E • 60 min

Spend in Daylight

The T.I.E loop runs on the Ukraine's ProZorro case: T Track Every Award -> I Inspect the Patterns -> E Enforce the Disclosure — one visible artifact per session, written commitments at the close.

★ Framework: T.I.EMoves: Track Every Award – Inspect the Patterns – Enforce the DisclosureCase Study: Ukraine's ProZorro
3Framework Moves
in this module
M1-01Move 1

Track Every Award

T.I.E

Included in kit: Track Every Award — part of the T.I.E installed in Spend in Daylight.

M1-02Move 2

Inspect the Patterns

T.I.E

Included in kit: Inspect the Patterns — part of the T.I.E installed in Spend in Daylight.

M1-03Move 3

Enforce the Disclosure

T.I.E

Included in kit: Enforce the Disclosure — part of the T.I.E installed in Spend in Daylight.

Module 02 of 07 • S.P.E.C • 60 min

Specifications That Invite Markets

The S.P.E.C loop runs on the The Open Contracting Partnership case: S State the Need -> P Pin the Essentials -> E Exclude the Slanted -> C Confirm the Market — one visible artifact per session, written commitments at the close.

★ Framework: S.P.E.CMoves: State the Need – Pin the Essentials – Exclude the Slanted – Confirm the MarketCase Study: The Open Contracting Partnership
4Framework Moves
in this module
M2-01Move 1

State the Need

S.P.E.C

Included in kit: State the Need — part of the S.P.E.C installed in Specifications That Invite Markets.

M2-02Move 2

Pin the Essentials

S.P.E.C

Included in kit: Pin the Essentials — part of the S.P.E.C installed in Specifications That Invite Markets.

M2-03Move 3

Exclude the Slanted

S.P.E.C

Included in kit: Exclude the Slanted — part of the S.P.E.C installed in Specifications That Invite Markets.

M2-04Move 4

Confirm the Market

S.P.E.C

Included in kit: Confirm the Market — part of the S.P.E.C installed in Specifications That Invite Markets.

Module 03 of 07 • B.I.D • 60 min

Fair and Full Tendering

The B.I.D loop runs on the ChileCompra case: B Broadcast the Opportunity -> I Invite on Equal Terms -> D Decide on Published Rules — one visible artifact per session, written commitments at the close.

★ Framework: B.I.DMoves: Broadcast the Opportunity – Invite on Equal Terms – Decide on Published RulesCase Study: ChileCompra
3Framework Moves
in this module
M3-01Move 1

Broadcast the Opportunity

B.I.D

Included in kit: Broadcast the Opportunity — part of the B.I.D installed in Fair and Full Tendering.

M3-02Move 2

Invite on Equal Terms

B.I.D

Included in kit: Invite on Equal Terms — part of the B.I.D installed in Fair and Full Tendering.

M3-03Move 3

Decide on Published Rules

B.I.D

Included in kit: Decide on Published Rules — part of the B.I.D installed in Fair and Full Tendering.

Module 04 of 07 • E.V.A.L • 60 min

Evaluating Bids on Evidence

The E.V.A.L loop runs on the Moldova's MTender case: E Establish the Panel -> V Vet the Conflicts -> A Adjudicate on Criteria -> L Log Every Judgment — one visible artifact per session, written commitments at the close.

★ Framework: E.V.A.LMoves: Establish the Panel – Vet the Conflicts – Adjudicate on Criteria – Log Every JudgmentCase Study: Moldova's MTender
4Framework Moves
in this module
M4-01Move 1

Establish the Panel

E.V.A.L

Included in kit: Establish the Panel — part of the E.V.A.L installed in Evaluating Bids on Evidence.

M4-02Move 2

Vet the Conflicts

E.V.A.L

Included in kit: Vet the Conflicts — part of the E.V.A.L installed in Evaluating Bids on Evidence.

M4-03Move 3

Adjudicate on Criteria

E.V.A.L

Included in kit: Adjudicate on Criteria — part of the E.V.A.L installed in Evaluating Bids on Evidence.

M4-04Move 4

Log Every Judgment

E.V.A.L

Included in kit: Log Every Judgment — part of the E.V.A.L installed in Evaluating Bids on Evidence.

Module 05 of 07 • A.W.A.R.D • 60 min

Awards That Defend Themselves

The A.W.A.R.D loop runs on the The Global Public Procurement Network case: A Announce With Reasons -> W Weigh the Objections -> A Affirm or Correct -> R Record the Outcome -> D Defend in Public — one visible artifact per session, written commitments at the close.

★ Framework: A.W.A.R.DMoves: Announce With Reasons – Weigh the Objections – Affirm or Correct – Record the Outcome – Defend in PublicCase Study: The Global Public Procurement Network
5Framework Moves
in this module
M5-01Move 1

Announce With Reasons

A.W.A.R.D

Included in kit: Announce With Reasons — part of the A.W.A.R.D installed in Awards That Defend Themselves.

M5-02Move 2

Weigh the Objections

A.W.A.R.D

Included in kit: Weigh the Objections — part of the A.W.A.R.D installed in Awards That Defend Themselves.

M5-03Move 3

Affirm or Correct

A.W.A.R.D

Included in kit: Affirm or Correct — part of the A.W.A.R.D installed in Awards That Defend Themselves.

M5-04Move 4

Record the Outcome

A.W.A.R.D

Included in kit: Record the Outcome — part of the A.W.A.R.D installed in Awards That Defend Themselves.

M5-05Move 5

Defend in Public

A.W.A.R.D

Included in kit: Defend in Public — part of the A.W.A.R.D installed in Awards That Defend Themselves.

Module 06 of 07 • W.A.T.C.H • 60 min

The Integrity Watch

The W.A.T.C.H loop runs on the The Infrastructure Transparency Initiative case: W Weigh the Red Flags -> A Audit on Schedule -> T Treat Findings Fast -> C Correct the Register -> H Heed the Overseers — one visible artifact per session, written commitments at the close.

★ Framework: W.A.T.C.HMoves: Weigh the Red Flags – Audit on Schedule – Treat Findings Fast – Correct the Register – Heed the OverseersCase Study: The Infrastructure Transparency Initiative
5Framework Moves
in this module
M6-01Move 1

Weigh the Red Flags

W.A.T.C.H

Included in kit: Weigh the Red Flags — part of the W.A.T.C.H installed in The Integrity Watch.

M6-02Move 2

Audit on Schedule

W.A.T.C.H

Included in kit: Audit on Schedule — part of the W.A.T.C.H installed in The Integrity Watch.

M6-03Move 3

Treat Findings Fast

W.A.T.C.H

Included in kit: Treat Findings Fast — part of the W.A.T.C.H installed in The Integrity Watch.

M6-04Move 4

Correct the Register

W.A.T.C.H

Included in kit: Correct the Register — part of the W.A.T.C.H installed in The Integrity Watch.

M6-05Move 5

Heed the Overseers

W.A.T.C.H

Included in kit: Heed the Overseers — part of the W.A.T.C.H installed in The Integrity Watch.

Module 07 of 07 • The Mastery Stack • 30 min

Integration, Action Planning and Procurement Mastery

The The Mastery Stack loop runs on the The Global Public Procurement Network case: T.I.E -> S.P.E.C -> B.I.D -> E.V.A.L -> A.W.A.R.D -> W.A.T.C.H — one visible artifact per session, written commitments at the close.

★ Framework: The Mastery StackMoves: T.I.E – S.P.E.C – B.I.D – E.V.A.L – A.W.A.R.D – W.A.T.C.HCase Study: The Global Public Procurement Network
6Framework Moves
in this module
M7-01Move 1

T.I.E

The Mastery Stack

Included in kit: T.I.E — part of the The Mastery Stack installed in Integration, Action Planning and Procurement Mastery.

M7-02Move 2

S.P.E.C

The Mastery Stack

Included in kit: S.P.E.C — part of the The Mastery Stack installed in Integration, Action Planning and Procurement Mastery.

M7-03Move 3

B.I.D

The Mastery Stack

Included in kit: B.I.D — part of the The Mastery Stack installed in Integration, Action Planning and Procurement Mastery.

M7-04Move 4

E.V.A.L

The Mastery Stack

Included in kit: E.V.A.L — part of the The Mastery Stack installed in Integration, Action Planning and Procurement Mastery.

M7-05Move 5

A.W.A.R.D

The Mastery Stack

Included in kit: A.W.A.R.D — part of the The Mastery Stack installed in Integration, Action Planning and Procurement Mastery.

M7-06Move 6

W.A.T.C.H

The Mastery Stack

Included in kit: W.A.T.C.H — part of the The Mastery Stack installed in Integration, Action Planning and Procurement Mastery.

Inside Every Module

A Complete Delivery Kit — Not a Slide Deck

Each of the 7 modules in Procurement Integrity Mastery ships the same sixteen-asset architecture. Pick it up and deliver the hour.

📊

Workshop Deck × 5 Colors

The module deck in Navy Blue, Emerald Green, Burgundy, Teal and Royal Purple — editable PPTX plus print PDF.

PPTX + PDF
🎙️

Word-for-Word Script

Opening story, stage directions, timing tables, case debrief and the closing commitments page — verbatim.

Trainer-ready
🗂️

Participant Workbook

Slide-anchored working notes, artifacts and reflection pages — print-ready for every seat.

Print-ready
✅

50-Statement Assessment

Five competencies scored statement by statement — 350 statements across the full program.

+30-min window
🏢

Documented Case Study

Story, analysis, discussion questions and framework application — a real company, observable moves.

Real companies
🧪

Core Activity + Game

A live-work lab plus a framework recall game per module — practice owns a protected slot every quarter hour.

Practice-first
⚡

5 Energizers × 7

Thirty-five energizers across the program — one every fifteen minutes, attention designed not hoped for.

Every 15 min
🏋️

Exercises + Job Aids

Applied follow-up exercises per module and one-page pocket references for the signature frameworks.

30-day follow-up
🎓

Instructor Guide + Welcome Pack

Program-level delivery handbook, session logistics, welcome letter and preparation work — the whole operating manual.

Full stack
Sixteen asset sets in three formats

One Program. Every Way You Deliver.

P

PowerPoint Decks (.pptx)

266 workshop slides (Master Deck + 7 Module Decks covering T.I.E Model, S.P.E.C Model, B.I.D Model, E.V.A.L Model, A.W.A.R.D Model, W.A.T.C.H Model, The Mastery Stack) in 5 corporate color editions (Navy Blue, Emerald Green, Burgundy, Teal, and Royal Purple). Fully unlocked for corporate branding.

W

Word Facilitator Kit (.docx)

7 word-for-word facilitator scripts, 7 facilitator guides, 7 participant workbooks, 7 module assessments (350 statements), 6 case studies (Ukraine's ProZorro, The Open Contracting Partnership, ChileCompra, Moldova's MTender, The Global Public Procurement Network, The Infrastructure Transparency Initiative), plus core activities, exercises, energizers and recall games for every module.

D

Print-Ready Editions (.pdf)

Clean, press-ready PDF editions of every slide deck, workbook, self-assessment, pocket job aid card, and post-program evaluation form — ready to print or distribute to cohorts of 12–24 participants.

Who it's for

Built for Professionals Who Develop Others

Managers, Directors And Senior Leaders

Programme leaders who want a clear operating rhythm, a common language for the team, and evidence in the weekly meeting. L&D teams that need a program which runs clean without external facilitators. Trainers and consultants who want a delivery engine they can brand and run for clients. Outcome installed: Seven frameworks · documented case studies · a dated 30-60-90 Procurement Integrity Mastery plan.

Corporate Trainers & Facilitators

Deliver a flagship 7-hour Procurement Integrity Mastery program on Monday morning without writing a single slide or script. Open the word-for-word script, run the core activity and framework recall game in every module, and facilitate like you built it.

L&D & Capability Directors

Roll out a unified Procurement Integrity Mastery operating system across cohorts of 12–24 participants — backed by 7 mnemonic frameworks (T.I.E Model, S.P.E.C Model, B.I.D Model, E.V.A.L Model, A.W.A.R.D Model, W.A.T.C.H Model, The Mastery Stack) and 350 scored assessment statements.

Consultants & Executive Coaches

Deploy the 6 documented case studies (Ukraine's ProZorro, The Open Contracting Partnership, ChileCompra, Moldova's MTender, The Global Public Procurement Network, The Infrastructure Transparency Initiative), applied written exercises and pocket job aids inside client engagements — no seat licenses or recurring fees.

Launch offer

One Program. One Price. Your Complete Training Library.

$187
$87

Regular price $187 — launch price $87 + $100 free bonus

Download the Complete Program →

One-time payment • Instant download • Secure checkout

Everything included in Procurement Integrity Mastery

  • ✓ 266 slides in 5 corporate color editions (PPTX + PDF) — master + 7 module decks
  • ✓ 7 word-for-word facilitator scripts + program instructor guide
  • ✓ 7 participant workbooks + 350-statement assessment pack
  • ✓ Every case study, activity, exercise, energizer and recall game — 20+ tools
  • ✓ Training plan, welcome pack, program brochure and job aids
  • ✓ Deliver inside your company or practice — no seat licenses, no recurring fees
Free Launch Bonus — $100 Value — 1-on-1 Procurement Integrity Strategy Session: Book a private session with Zohaib Butt and map your rollout: which modules to run, in which order, with which success measures — your dated 30-60-90 delivery plan, built together.
Questions, answered

Everything You Might Be Wondering

How is this different from a course I send my team to watch?

There is nothing to "send". This is the complete delivery kit — slides, scripts, workbooks, assessments and games — the same assets a certified facilitator runs in a live executive session. You (or any trainer) deliver it; the kit makes the hour feel rehearsed from the first run. Watching builds awareness; running this program builds behavior.

Can I really deliver it without certification?

Yes. Every module runs on the same 60-minute engine with a word-for-word script and a minute-by-minute run sheet. Read the script once end to end, follow the run sheet with a visible timer, and the hour is fully controlled. The facilitator guide also lists the pitfalls — what to avoid in every segment.

Why five color editions of the same deck?

So the material can sit inside your corporate identity instead of fighting it. Navy Blue, Emerald Green, Burgundy, Teal and Royal Purple — identical content, five professional schemes. Add your logo, adjust examples to your industry, and the program reads as yours.

What exactly is the $100 free bonus?

A private 1-on-1 Procurement Integrity Strategy Session with Zohaib Butt, booked after your purchase during the launch window. You leave with a dated 30-60-90 delivery plan — which modules to run, in which order, with which success measures. It is included free this week; after the window it is no longer part of the offer.

Can I use it for client work?

Yes — trainers, consultants and L&D teams deliver the program inside their own client engagements. The license covers commercial delivery; the only restriction is republishing the raw files as your own product. Your client sees your brand on the room; the kit stays your back-office engine.

What happens when the countdown ends?

The timer simply loops into a fresh 24-hour launch cycle and the launch price holds while it runs. The countdown runs in your own browser, so what you see is your honest remaining window.

Install the System. Retire the Defaults.

Seven modules (T.I.E Model, S.P.E.C Model, B.I.D Model, E.V.A.L Model, A.W.A.R.D Model, W.A.T.C.H Model, The Mastery Stack). Six documented case studies (Ukraine's ProZorro, The Open Contracting Partnership, ChileCompra, Moldova's MTender, The Global Public Procurement Network, The Infrastructure Transparency Initiative). 266 slides across five color editions. One complete Procurement Integrity Mastery operating system — at the $87 launch price with the Free $100 1-on-1 Procurement Integrity Strategy Session Session.

Get the Complete 7-Module Program — $87 →
Get the Complete Training Kit — Add to Cart Or start with the free sampler